Under code provisions adopted on August 11, 2026, the Town added a groundwater investigation for below-grade improvements.
The rule is short and sits in the building code at Section 3.02.008. An engineer's findings can shape the lower level of a house before the design is final.
Why the Town wrote it
The change began at a Town Council study session on July 7, 2026. People Newspapers reported that Engineering Services Manager Richard Wagner recommended revising the stormwater ordinance, citing nuisance, safety concerns, and the impact on adjacent properties and public infrastructure.
According to that report, the old ordinance did not clearly say which discharges had to go into the Town's underground stormwater system and which could go to a street, alley or easement. People Newspapers wrote that this had led to "differing interpretations during housing development review processes, particularly for new homes with basements, where groundwater infiltration can generate significant and continuous pumped discharges."
That phrase about continuous discharge explains the rule. Rain stops, but groundwater seeping toward a below-grade wall can keep a sump pump cycling long after the weather clears. The revision drew a line between the two kinds of water, and the code history shows the new section adopted on August 11, 2026.
The groundwater investigation
The code spells out what the engineer's groundwater investigation has to address.
- An evaluation of existing groundwater conditions
- Seasonal groundwater fluctuations, where available
- Soil and subsurface conditions
- The anticipated need for temporary or permanent dewatering
- Potential impacts on adjacent properties and public infrastructure
- Whether groundwater is likely to enter any proposed basement, crawl space, foundation drainage system or other below-grade structure
The code discusses a drainage plan and a letter of recommendation, including foundation drainage, sump pumps and methods for removing and discharging groundwater.
The Director of Engineering may require more geotechnical information, groundwater monitoring, testing or engineering analysis to evaluate a site.
Two kinds of pumped water
The code distinguishes groundwater from surface water, including runoff from precipitation, irrigation or similar sources.
Above ground, the building code itself also changed in 2026. On January 6, 2026, the Town moved its adopted baselines to the 2024 edition of the International Building Code, as its Building Code article shows, and to the 2024 International Residential Code under its Residential Code article. On August 11, the same date the groundwater provisions were adopted, the Town adopted a further amendment to the Residential Code.
Site rules amended on April 15, 2025, in the Town's general building provisions complete the picture. For major residential construction sites and activities, the code addresses perimeter fencing, stored materials and weekly cleanup. Violations can bring fines of up to $500 per day or suspension or revocation of the permit.
If you are weighing a Highland Park lot or a newer home with a lower level, Richard Noon can help. Let's Connect.